Nebel Comments and Attempts to Clarify EMC2 Fusion Status and Situation

Dr. Richard Nebel has commented to try and clear up some confusion about EMC2 fusion work on Inertial Electrostatic (IEC or Bussard) nuclear fusion

As usual, I seem to have created some misconceptions by my comments. First of all, what we said on our website is that the work on the WB-7 has been completed. We did not discuss the results. If you would like to conjecture what those results are, let me suggest that you notice the fact that we are working on the WB-8 device. The WB-8 was not a part of Dr. Bussard’s original development plan. This device came about as a result of the peer review process which suggested that there were issues that needed to be resolved at a smaller scale before proceeding to a demo. This was a conclusion that EMC2 heartily concurred with. I don’t want to leave people with the impression that everything on the WB-7 is identical to the WB-6.

Secondly, in our contract with the DOD, EMC2 owns the commercialization rights for the Polywell. However, commercialization is not something that we can do with our DOD funding. That is what we would like to look at with any contributions from the website.

This will enable us to:
1. Design an attractive commercial reactor package.
2. Identify the high leverage physics items that most impact the design (i.e. how good is good enough).
3. Give us a base design when we are ready to proceed to the next step.

rnebel (Sent Wednesday, March 24, 2010 9:12 PM)