Despite massive internet hype, the prototype of solar “road” can’t be driven on, hasn’t generated any electricity and 75 percent of the panels were broken before they were even installed.
Of the panels installed to make a “solar footpath,” 18 of the 30 were dead on arrival due to a manufacturing failure. Rain caused another four panels to fail, and only five panels were functioning shortly thereafter. The prototype appears to be plagued by drainage issues, poor manufacturing controls and fundamental design flaws.
If it had worked, the panels would have powered a single water fountain and the lights in a restroom, after more than $500,000 in installation costs provided by a grant from the state government. The U.S. Department of Transportation initially handed $750,000 in grants to fund the research into the scheme, then invested another pair of grants worth $850,000 into it. The plan, dubbed, “Solar FREAKIN’ Roadways” raised another $2.2 million dollars in crowd-funding, even though several scientists publicly debunked the idea.
@thunderf00t @eevblog Yep I was right. pic.twitter.com/13SKtszIAi— Brendan MaC (@bmcguitar) March 6, 2017
Brian Wang is a Futurist Thought Leader and a popular Science blogger with 1 million readers per month. His blog Nextbigfuture.com is ranked #1 Science News Blog. It covers many disruptive technology and trends including Space, Robotics, Artificial Intelligence, Medicine, Anti-aging Biotechnology, and Nanotechnology.
Known for identifying cutting edge technologies, he is currently a Co-Founder of a startup and fundraiser for high potential early-stage companies. He is the Head of Research for Allocations for deep technology investments and an Angel Investor at Space Angels.
A frequent speaker at corporations, he has been a TEDx speaker, a Singularity University speaker and guest at numerous interviews for radio and podcasts. He is open to public speaking and advising engagements.