Tesla Megapack Factory Production Limit Solved and Capacity Will be Doubled to 80 GWh

Bradford Ferguson reports that the Tesla Megapack factory will expand to 80 GWH per year of capacity. The original megapack factory capacity was 40 GWH. Bradford also reports that the limitations on Tesla megapack production will be lifting. The Tesla factory only had one of two lines running and has been producing 4 GWH per …

Read more

Tesla 2023 – 2030 – Cybertruck, Semi, Next Gen & More

I, Brian Wang, had a great talk with Warren Redlich about Tesla production and deliveries in 2023, the future of Model 3 and Model Y, Cybertruck Semi, the next-generation vehicle platform, megapack and more. I think Tesla will trend to 90% of actual production capacity (production being demonstrated sustained over weeks). In Q1 2023, Tesla …

Read more

Telsa Investor Day and Master Plan 3

Tesla Investor Day will be discussing Master Plan Part 3, which is scaling the materials and construction of batteres to 20 Terawatt hours per year and an overall level of 300 TWh. I have looked at battery materials for and addressing scarcity of materials batteries, magnesium, graphite etc… CATL is scaling non-lithium batteries (CATL M3P …

Read more

1000 Megawatt Hour $438 Million Tesla Megapack Project in Ontario

The Oneida Energy Storage Project (1000 MWh) is the largest of its kind in Canada and amongst the largest in the world. It will provide a gigawatt-hour of much needed capacity to the Ontario grid, while prioritizing local Indigenous partnerships and environmental benefits. NRStor and Six Nations of the Grand River Development Corporation (“SNGRDC”) have …

Read more