Path to Cancelling SLS and Orion ?

The pressure to fix SLS and get to a launch for Artemis 2 will build. If there is another rollback in April or new leak or valve issue in May or long repairs. The program will get closer to reaching political exhaustion. This pressure will increase if there are clean launches of SpaceX Starship in …

Read more

SLS Second Wet Rehearsal Going Well

✅ Progressing well — no major hydrogen leaks reported this time. ✅ Rocket is now in its final fueling configuration (“replenish mode”) on all stages (core stage + Interim Cryogenic Propulsion Stage). ✅ Brief ground communications glitch earlier this morning (around 11 a.m.) was quickly resolved by switching to backup systems. ✅ Teams have completed …

Read more

20 Years of SLS and Constellation – 50 Years of the Same RS25 Engine and Each One Costs $145 Million

SLS (Space Launch System) uses a 50 year old rocket engine design that now costs $145 million each (not including labor and testing) which is over 300 times more expensive than the more powerful SpaceX Raptor 3 engine. It is a flying museum piece that is using difficult liquid hydrogen which was the reason for …

Read more

NASA Artemis 2 Earliest Launch is Now March or Later – SLS Has Hydrogen Leak

NASA Artemis 2 mission after encountering hydrogen leaks during a fueling test of the Space Launch System. The Space Launch System (SLS) and Orion spacecraft have been central to NASA’s Artemis program, aimed at returning humans to the Moon. Development began in earnest around 2011, following the cancellation of the Constellation program in 2010. SLS …

Read more

NASA and Other Federal Budget Overruns

What is the history of NASA and some Federal Budget overruns? The Space Shuttle, ISS, SLS, and Constellation programs all experienced significant delays (2–7+ years) and budget overruns (billions). NASA has tried to pivot to fixed-price contracts since 2006 contrasts with the DoD’s continued reliance on cost-plus for complex procurements, though fixed-price use occurs in …

Read more

NASA Keeps Asking for Billions for SLS But Will Not Measure and Control Costs

The SLS is the world’s most powerful rocket and will enable NASA to return humans to the moon. NASA requested $11.2 billion in the fiscal year 2024 president’s budget request to fund the program through fiscal year 2028, in addition to the $11.8 billion spent developing the initial capability. NASA) does not plan to measure …

Read more